亚洲色欲www综合网-亚洲精品综合一区二区三-亚洲午夜精品视频-免费看一级特黄a大片-久久超碰色中文字幕超清-av色噜噜-成人在线观看亚洲-麻豆文化传媒精品一区-天天躁夜夜踩很很踩2022-黄色一级大片在线免费看国产一-国产熟女高潮视频-欧美成人精精品一区二区三区-国产无遮挡免费视频-大肉大捧一进一出好爽app-无码专区3d动漫精品免费-久久免费99精品国产自在现线-一区三区在线专区在线-东京一木一道一二三区-国产又色又爽又刺激在线播放-亚洲精品乱

News

Kazakhstan Project HL-6 Team received Party A’s KAM reward

Date 2012-04-19

In Party A’s KAM drilling construction, the Kazakhstan Project HL-6 Team’s reached Party A’s requirements for the three wells of K174, K176 and K192 in aspects of construction cycle, and site management, for which it received 200,000 KZT (about USD1351), 100,000 KZT (about USD676) and 300,000 KZT (about USD2027) in bonus respectively.

 

K174 Well needs winter operation, the drilling cycle is 11 days; K176 Well needs summer operation, the drilling cycle is 11 days; K192 Well also needs summer operation, the drilling cycle is 9 days. The drilling cycles of these three wells all exceed Party A’s indicator.

 

KAM project features harsh climate environment, in winter the temperature drops to 30 degrees below zero, in summer the temperature rises to 50 degrees. All members of HL-6 Team have no fear of coldness and heat, aiming to establishing Hilong’s brand image, they overcame all difficulties to safely and successfully completed construction tasks of all the wells, and recorded outstanding performance, which enhanced Hilong’s competitiveness in the Kazakhstan market.

 

HL-6 drill rig towering at Kazakhstan well site